Carrongrove Hydro 500KW

Laying the 1.4 metre pipe

Connecting into the turbine house

Installing the 500kw turbine

Removing the roof to fit the 500kw turbine

Turbine outfall pipe cast in the channel

Casting the pipe into the settling chamber

Bruach Caorainn Hydro 1.2MW

Starting the base of the weir

Turbine house roof under construction

Laying out the 1.1km of fibre glass pipes

Laying the 1.1km plastic pipe

Commissioning the turbine

Turbine house complete